Cuplok spigotted standard/vertical is basically used in get in scaffolding work and also act as a base structure for Formwork strengthening applications. The cup joints are at every 500mm intervals. The inbuilt movable top cups are made for rough site handling. The welded bottom cups are made from high grade steel. Integral spigots are 150mm long and are provided at the top of each standard for making upright connections.
Item code | Size(mtr) | Wt. (kg) |
---|---|---|
1011 | 0.50 | 2.46 |
1012 | 1.00 | 4.95 |
1013 | 1.50 | 7.40 |
1014 | 2.00 | 9.90 |
1015 | 2.50 | 12.42 |
1016 | 3.00 | 14.80 |
The ledger/horizontal are produced using the 48.3mm O.D. tube, it has forged steel blade ends which fitted into the bottom cups of the standards and are secured in place by the corresponding top cups. They are available in varied lengths to enable desired grid shapes for the scaffolding/Formwork.
Item code | Size(mtr) | Wt. (kg) |
---|---|---|
1021 | 0.60 | 2.36 |
1022 | 0.90 | 2.42 |
1023 | 1.00 | 3.74 |
1024 | 1.20 | 4.45 |
1025 | 1.50 | 5.40 |
1026 | 1.80 | 6.50 |
1027 | 2.00 | 7.20 |
1028 | 2.50 | 8.91 |
Drop into place over the ledgers and are secured with a locking device to prevent movement. Act as conventional transoms but extend beyond the inside ledger to provide intermediate support to one or two inside boards.
Item code | Size(mtr) | Wt. (kg) |
---|---|---|
1031 | 1.621 | 7.50 |
These Cuplock intermediate transoms are used with Hop-up brackets. They are useful to make up for the distance between standards if it exceeds the span of scaffold boards. Cuplock intermediate transoms are used to secure the 2 boards and 3 boards.
Item code | Size(mtr) | Wt. (kg) |
---|---|---|
1041 | 0.565 | 7.50 |
1042 | 0.795 | 3.70 |
1043 | 1.200 | 5.20 |
1044 | 1.300 | 5.50 |
1045 | 1.800 | 7.30 |
1046 | 2.500 | 16.5 |
We offer a wide range of Decking System, which are known as composite floor systems and are easy to install. These adapters are widely acclaimed for their robotic construction and high tensile strength and find wide application in various industries. Further, this is easy to install which saves time & labour, also provides an advantage with no maintenance.
Item code | Size(mtr) |
---|---|
1041 | 0.565 |
Cuplock Cantilever frame is manufactured under the deft professionals' guidance by make use of supreme quality materials and avant-garde methodologies. Offered dimensionally accurate frame is used for installation in machines. In addition to this, the offered Cuplock Cantilever Frame is made available in diverse sizes and finishes at marginal prices.
Size(mtr) |
---|
1.0 |
1.5 |
The quick action drophead supplied complete with nuts and bolts is designed to fit on standard props or adaptors for Cuplocks scaffolding. They allow panels and beams to be struck and re-used after only 3 or 4 days, leaving the support in position for the remainder of the curing period of the concrete slab. The primary head remains in contact with the concrete while the secondary head and its supporting wedge are released by a single hammer blow. The height of the drophead is 214mm and the striking distance allows the beams and panels to drop only 115mm for the their safe removal a marked improvement in terms of speed and safety compared with other systems. The drophead has a load carrying capacity of 40kN.
Well made Scaffold's Infill Beam is Component of Cuplock Shuttering System Scaffolding. It provide a transom support underneath formwork plywood together with decking beams, drop head. Size of our Infill beams are customized.
Size(mm) |
---|
1200,1800 |
The offered spigots are manufactured with the finest quality raw material as well as pioneered techniques at vendors' end. Our provided spigots are extensively used for connecting the scaffolding pipes. To ensure their quality, our offered spigots are rigorously tested against diverse parameters of quality by our quality analysts.